- Creating planned independent requirement with "Create order"
The function "Create order" is called in the detailed scheduling planning board. A negative figure is entered in the quantity field in the respective dialog box. The function then creates a... - PP - The Common Planning Strategy used
The planning strategies are maintained in Customizing for Demand Management in SM30 - V_T461S. Define the Planned Requirement Type and assign the requirement class in OMP1. Define the... - Alternative item - Problems during quantity changes
On the component detail screen in the process order or production order as well as maintenance order or network, you change the usage probability or the requirement quantity for an alternative item... - Negative quantities for "ProcurementOrderAPS.GetList" BAPI
Symptom Negative quantities are contained in the QUANTITY, QUANTITY_REDUCED or CONF_QUANTITY fields in the REQUIREMENTS parameter of the "ProcurementOrderAPS.GetList" BAPI... - MRP Planning Strategy for SAP
Strategy 10 - PIR Type - LSF Net requirements planning. That is even the warehouse/storage location stock is also taken into account besides planned receipts / issues during planning for... - When do we use planning without final assembly strategy?
We have mainly MTS, MTO, planning with final assembly and planning without final assembly. Now when we are dealing with planning with final assembly, we would usually produce subassemblies (HALBs I... - SAP SD: Scheduling Agreement Vs Contract
A schedule agreement contains details of a delivery schedule but a contract just contains quantity and price information and no details of specific delivery dates What's the difference between... - Difference between Tcode MB1A, MB1B, MBIC
MB1A - Goods issue leads to a reduction in Stock. MB1B - Transfer posting is used when there is a change in Stock ID or stock category of a material. There is no need for the actual (physical)... - SAP Production Planning Table
Demand Management PBED Independent Requirements Data PBIM Independent Requirements by Material Repetitive Manufacturing SAFK RS Header Master Data S025... - What is Discrete Manufacturing, REM and Demand Management?
1. What is Discrete Manufacturing? 2. What is REM? 3. What is Demand Management? Here are difference between Discrete and REM and small explanation about discrete and repetative manf.: ... - FAQ:Manufacurer Part Number-Purchasing
In Part Exchange in ME22n, When the material needs to be fully interchanged, the quantity is entered as zero in the material exchange tab. As a consequence the subitem created for the original... - General split for batch determination as modification
No split is performed in the standard version during batch determination in the production order if only one batch is available and if it does not cover the requirements (because partial receipts... - FAQ : Capable-to-Match (CTM) planning
How can I improve the CTM performance ? Answer : 1) Hardware (technical improvements) Regarding the hardware it is recommended to use a CPU with a high quality. A system with multi CPUs... - Configuring Availability Check
Availability check 1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the... - Work Scheduling View in Material Master
What is the importance of work scheduling view in material master and the standard values in Routing? If I am maintaining Lot size dependent information such as set time, Interoperation time...
- SOP - creation of planned orders
When I do the rough cut in SOP I enter the forecast in Sales row and then come up with the production schedule in Production row. When I transfer that plan to Demand Management my independent... - Function Materials Requirements Planning
The main function of SAP Material Requirements Planning is to guarantee material availability, it is used to procure or produce the requirement quantities on time both for internal purposes and for... - How to create Credit note in sales without having quantity field.
Hi Experts I want to create credit notes in sales without having quantity field. I want to have the credit value only to be posted against the customer. This is actually done in FI now wherein we... - Program to Generate Invoice, Quantity, Delivery, Material Report
Program to Generate Invoice, Quantity, Delivery, Material Report Please find the attachments.. - Stock Report- Movement Type '301'
I am developing a stock report. I have included movement type '301' in my report to show goods transfer from plant to plant.I am looking for a field which can differentiate between the quantity to be... - Process Order details
Good Evening to Every Body I want help which is related to reports. the requirement is print all the details(actually quantity,actually cost,variance,price variance,quantity variance). related to... - QM in production -Stock is different from MD05 and MMBE
Hi Guys, In Inspection lot for one material under tab Inspection lot quantities.There is some number of quantity in inspection lot quantity for example say 5000.In that 2000 are moved to... - Deployment doesn't consider Safety Stock
Hi, I would like to run the deployment without considering the Safety Stock as available quantity to deploy. So, the stock to be deployed must not consider the Safety Stock quantity. Can anybody... - Quantity Scale Configuration in Appraisal
How to Configure Quantity Scale into SAP HR Personnel Development Sub module? I want to give scale as per each employee KRA's and achievements. Please help me. Thanx & regards, Neeta - Acquastion of Asset f-90 in this Quantity Option was not comming
When I entering acquation of asset f-90 the quantity option was not comming and if qunatity option was not the Depreication entry will not show - Using BI / BW to Supply Data to External Planning Systems
i2 Demand Planner gets historical "demand" (actually historical sales) from a legacy system. SAP will replace the legacy system soon, and the question about how best to acquire data for... - Subcontracting
We send material for subcontracting. The job of subcontractor is to segragate OK and not OK parts, fill OK parts into trays and bring to the plant. Components (in this case trays) must be sent as... - Does anyone know if the previous quantity is stored somewhere as a historical data.
we have an SAP program that updates the REORDER POINT of select material in certain plant ... this being said we are looking for a way to recover the previous quantity once the change has been made... - Queries related to dictionary
What is the use of assigning reference field when declaring a fieldname with currency/quantity type. With regards, - Atlernate Materials used in BoM
Dear Friends, We are in the process of implementing ECC 6. I am the team lead for PP & PM modules. We are facing a typical problem and need your help. We are basically heavy engineering company...
- SAP Product Costing Configuration
SAP Product Costing Configuration INTRODUCTION A Warm Welcome Friends. You are going to love this book and we have taken great efforts to ensure that we present the configuration in a very simple... - BC - IDoc Interface: EDI Application Scenarios
BC - IDoc Interface: EDI Application Scenarios Purpose The application scenarios describe business processes in which EDI can be implemented. Consequently, two partners are always involved in... - TAFI40 Financial Accounting Part IV
TAFI40 Financial Accounting Part IV Overview of Controlling General Tasks of Controlling The Components of CO Integration Overview of Controlling: Unit Objectives At the... - Enchancing the Quality of ABAP Development
Contents Preface11 1Introduction =======================================13 1.1The Technical Quality of ABAP Software ===================16 1.1.1Aspects of Technical Quality... - Asset Accounting (FI-AA) Overview
Asset Accounting Overview Purpose The Asset Accounting (FI-AA) component is used for managing and supervising fixed assets with the SAP R/3 System. In SAP R/3 Financial Accounting, it serves as a... - Logistics Invoice Verification
Contents Logistics Invoice Verification (MM-IV-LIV)................................................................... 8 Incoming Invoice... - Purchase Requistion Manual Guide
A request for purchase is a purchase requisition or instruction to buy a certain quantity of a material or service to be available at a certain point in time. Learn about the following in this... - (BC-SRV-ALV) Working With the ALV Grid Control
Contents ALV Grid Control (BC-SRV-ALV).................................................................................................8 Instance for the ALV Grid...
- Demand Management
Sales quantities in SOP for certain days are transferred into Demand Management and are shown as planned independent requirements. We need to keep the settings in SOP and change the periods in Demand... - Bills Of Material
We have a BOM - 'A' with two packing materials 'X' and 'Y'. For 1000 units of 'A', 1 packing material of 'X' is required and for 50 units of 'A', 1 packing material of 'Y' is required. Base quantity... - Bills Of Material
Q: We have a BOM - 'A' with two packing materials 'X' and 'Y'. For 1000 units of 'A', 1 packing material of 'X' is required and for 50 units of 'A', 1 packing material of 'Y' is required. Base... - FAQ: Price determination in purchasing
Q1:Problems occur during price determination in transaction ME21N or ME22N. Implement Note 381391 and the related notes that it contains, unless - depending on your Support Package level - they... - DATA DICTIONARY FAQ
What are the layers of data description in R/3? · The external layer. · The ABAP/4 layer. · The database layer. Define external... - The Individual / Collective indicator in the material Master determines
a) Whether a component is procured for a special customer requirement in the individual segment b) Requirement quantities of dependent materials are grouped together during MRP run c) The... - Interview questions of Production Planning..
Q: How to configure the planning calendar for the ATP calculation where goods are shipped every other working day? A: Use Transaction MD25 and define calculation rule for every other working day... - How can I use variable size items?
Q: How can I use variable size items? A: For example, consider an item A with 'kg' as base Unit Of Measurement(UOM) and 'm3' as stock keeping/issue unit. Conversion factor is 1kg = 2.4 m3. In... - where is rebate define for quantity REBATE
in rebate aggrement details we will define the rebate basis whether it is the the quantity rebate or volume based rebate. - Acknowledgement of the PO by vendor
Wherever PO is sent to the vendor via EDI, we want an acknowledgement of the PO by vendor. Which fields are updated and what should be my procedure? A: Execute Program: IDOC_INPUT_ORDRSP Process... - Production Orders FAQ
Q: We get an error message "Control parameters for scheduling not defined" while creating test production Orders. Why? A: Before you attempt creating Production orders, configure your ... - SAP - MM FAQ(Material Master)
Q: How can I extend all material to a new plant? A: The SAP program - RMDATIND is used to create /update material master record. Q: How can we delete materials permanently from Material... - FAQ: Account assignment system response
Summary Symptom This note answers frequently asked questions about the EBP account assignment. Other terms SRM, EBP, account assignment, ACC, META_ACCSERV_CHECKACCASSIGNMT ... - FAQ: Purchase order change and goods receipt in purchasing
Q1. A goods receipt was posted for a purchase order. You then want to make other changes in the purchase order. What may be changed? If follow-on documents already exist for a purchase order...