SAP R/3
Viewing 0 - 20 out of 64 Articles
PP (Production Planning)
- how can i delete from the stock created
i made a confirmation that is not physically produce and has also being released my quality management which as added to my stock..........i used a process order for finish goods and the quantity is ... - Can someone suggest me the list of activities in PP- production process (manufacturing process)
I would like to explore quality related things in PP Module, Can someone suggest me the list of activities in PP- production process (manufacturing process) ... - Quality process in PP Module
I am new to SAP PP, I would like know the list of quality related activities which comes under PP especially in Manufacturing process. ... - SAP PP basic data
Can anybody tell me is valuation area level is the organization level between company code and plant? ... - What is backflush in SAP PP.
Sir Any one describe me what is backflush? J.Balakrishnan ... - Lower- Uper limit confirmation
Dear All Have anybody can help me to set lower-uper limitation in BOM or process order to avoid user do confirmation less than qty reqire ? Thank & regards. ... - Error UN_CAUGHT EXCEMPTION CX_SLD_API_EXCEMPTION
Hello, I am Ranjan ,I am getting problem while doing the following operation. In co02 when I am releasing Por. Order After then when I save it it is going to dump. saying that runt ... - How to restrict the production order confirmation unless goods issue are done
how i can restrict the production order confirmation unless all the production order BOM components goods issue are done? i am using transaction (CO11N) to confirm operation or the mass processing tr ... - Production entry
hi i am new for SAP PP . I have entered Production Order Cofirmation. but now i have to reverse it without affect RG1. can we do these if it is possible give detail flow if possible with snapshot t ... - SOP - creation of planned orders
When I do the rough cut in SOP I enter the forecast in Sales row and then come up with the production schedule in Production row. When I transfer that plan to Demand Management my ... - MRP Output-Craetion of Planned orders
Dear PP gurus, Greetings. I have one query related to MRP Run ... Query .Scenerio is MTO-Make to order and sales order is received , then i run the MRP ,but in the configuration I have two manufact ... - Period Offset for Planning Book - Can this value be changed dynamically?
I have a planning book with a Monthly Period Indicator, which my company uses to enter forecasts in monthly buckets for finished goods products. Currently, this is set to 1, thereby inhibiting e ... - Atlernate Materials used in BoM
Dear Friends, We are in the process of implementing ECC 6. I am the team lead for PP & PM modules. We are facing a typical problem and need your help. We are basically heavy engineering company a ... - LTP run should consider the Sloc MRP indictor rather than complet Plnt Stk.
Hi , Requirement : Even for LTP run system should consider the Sloc MRP indicator. It is the standard SAP feature to consider the Plant Stock during the LTP (Simulation Run) though a particular ... - Problem regarding MRP RUN
Hi, This is manish.Here i want some solution regarding the problem of mrp run. 1)I have 2 plants suppose X & Y, 2)Now i am planning suppose a material "Ram cylinder" 3)The notea ... - Issue relating to the Production Order activities actual costs are not updated when production order confirmed and saved in PP module
Hi Dear All I have an issue relating to the Production Order activities actual costs are not updated when production order confirmed and saved in PP module. When goto PO and check the cost anal ... - Sales order driven planning
Hi There all, I'm a newbie but I hope you guys can help me. I'm a production planner for fresh/frozen meat products. We use SAP since few days and I'm having troubles with some issues: * Is th ... - Inspection characteristic in a production routing
Hello, We are assigning inspection characteristics to operations within a production routing (Usage N) using transaction CEWB. The users want a tool that allows them to execute a where-used of their ... - CM21 – CM25 Dispatching with activity elements (not with activities)
Hi gurus Does anyone know if it is possible to dispatch in CM21 with activity elements? Why am I using activity elements? An activity element must be firmly assigned to an activity; so that it adopt ... - Credit memo - Price too high (tolerance limit of 2,00 % exceeded)
Hi all, Please assist The PO invoice has already been posted but unfortunately one user posted a credit memo, and changed the original quantity instead of 1, he entered 0.900. so now when trying to ...
Posted in: PP (Production Planning) » Make to Order | By: femi | Date: 13 May 2012 8:19 am | Comments (0)
Posted in: PP (Production Planning) » | By: Ramesh | Date: 08 Apr 2012 3:37 am | Comments (2)
Posted in: PP (Production Planning) » | By: | Date: 08 Apr 2012 3:19 am | Comments (2)
Posted in: PP (Production Planning) » | By: Rupesh | Date: 08 Apr 2012 3:10 am | Comments (1)
Posted in: PP (Production Planning) » | By: j.balakrishnan | Date: 08 Apr 2012 3:09 am | Comments (2)
Posted in: PP (Production Planning) » Production Orders | By: Thida Lim | Date: 08 Feb 2012 8:51 am | Comments (0)
Posted in: PP (Production Planning) » | By: chittaranjan swain | Date: 04 Feb 2012 6:36 am | Comments (0)
Posted in: PP (Production Planning) » | By: ahmed | Date: 16 Jan 2012 12:31 pm | Comments (5)
Posted in: PP (Production Planning) » | By: | Date: 29 Dec 2011 2:02 pm | Comments (0)
Posted in: PP (Production Planning) » | By: | Date: 29 Dec 2011 8:22 am | Comments (1)
Posted in: PP (Production Planning) » | By: | Date: 27 Dec 2011 7:41 am | Comments (0)
Posted in: PP (Production Planning) » | By: | Date: 26 Dec 2011 10:38 am | Comments (0)
Posted in: PP (Production Planning) » | By: S Sathyanarayanan | Date: 26 Dec 2011 9:39 am | Comments (1)
Posted in: PP (Production Planning) » | By: | Date: 23 Dec 2011 10:28 am | Comments (0)
Posted in: PP (Production Planning) » | By: MANISH K. BACHATE | Date: 14 Dec 2011 11:05 am | Comments (6)
Posted in: PP (Production Planning) » | By: dreddy | Date: 14 Dec 2011 6:23 am | Comments (1)
Posted in: PP (Production Planning) » | By: Martijn Kleinsmann | Date: 14 Dec 2011 6:21 am | Comments (1)
Posted in: PP (Production Planning) » | By: Maria | Date: 13 Dec 2011 10:16 am | Comments (3)
Posted in: PP (Production Planning) » | By: salvo | Date: 12 Dec 2011 12:06 pm | Comments (1)
Posted in: PP (Production Planning) » Production Orders | By: helia antonio | Date: 25 Nov 2011 1:09 pm | Comments (0)
Tutorials | Forum | Books | Interview Questions | Transaction Codes | Institutes | Jobs | Classifieds | News | Announcements
SAP ERP Support/Consulting | RSS/Syndication | Contact Us | Terms Of Use | Terms & Conditions
SAP ERP Support/Consulting | RSS/Syndication | Contact Us | Terms Of Use | Terms & Conditions
©2005-2011 SAP Techies. All rights reserved.