Inspection results have been recorded for material 'A' batch '1' for inspection type '04'. If we produce material 'B' batch '2' using material 'A' batch '1' as a component (a new process order) is there any way to tranfer inspection results from the previous inspection lot to this new inspection lot?
We face the similar problem during material to material downgrade (regrade) when we have to manually create an inspection lot for the new material and enter all results from the previous lot for the origin material.
your suggestions and comments are welcome
Ans:
The only I know is that if create a cutting order, the new batch inherit all the batch values the original batch had. No QM values will be inherited unless they linked to batch (i.e. MIC linked to a class characteristic).
OR
yes, it will be possible in those cases the batch-where-used-list will be extended with the batch history. Check transaction MB56. Enter material, batch and plant (the one you want to issue the CoA) and press top-down. By this you will see the history of the final batch and all other material/batches used to produce the final batch. Check the certificate profile for the correct settings (what's the SAP release you are working with?). Be aware that not all processes create an entry in the Batch-where-used-list, but normal process orders will do as some other processes like UBSD (Transfer order with SD).