SAP R/3
Viewing 0 - 20 out of 46 Articles
PS (Project Systems)
- Report/report interface / Goto line item report
Symptom You try to assign line item reports in the report/report interface in the cost reports in the Project System. Assigning the transaction or the report attached to the transaction does not p ... - Print control in the Project Builder
You have implemented Note 338391 in your system which permits you to print shop floor papers from the Project Builder. (As of Release 4.70, the prerequisites for printing the shop paper from the Proj ... - Project System: Consulting notes
Consulting notes in PS Structure: 1. Master data a) General Archiving PS_PROJECT Auth ... - RPM_FIN02-PS Project hierarchy retrieval for a project link
Symptom In xRPM4.0, for an external link to a Base Project system Project(object type = 'PD'), the financial upload (Report:RPM_FIN02) does not return the financial data of all the hierarchy PSP e ... - SAP enhancement CNEX0002: No authorization
Authorizations, which you possessed before the customer enhancement for the authorization check (CNEX0002) has been activated, are missing once it is activated. As a result, the following problems ca ... - Validations in PS
I am trying to use validation in the Project. Can any one tell when are the call up points 110 and 120 trigerred ? I want to validate one of the user defined fields in WBS. Everything is wor ... - What is WBS element?
1) What is WBS element? 2) What is the Tcode to get to that screen? 3) What is the need and pupose of WBS element? 4) Do we happen to work on Functional module during our implementaion projec ... - Project completed?
Hello All, I have a question that how can I know a project is completed or closed. Is there a field in any table that hold the status of the project? Thanks in advance! in SAP world there are ... - System doesnot perform budget availability check as soon as i release project
I face three problems in SAP PS implementation, 1. When i create project and assign budget to it, system check budget only if project, system status is on created. When i change status from crea ... - Capacity Planning in PS module; Calendar like in MS Projects
With Pool Capacity we can generally define capacity for a group of expertise in a given Work Center. Meaning that if I have 10 peoples working at 40 hours a week each, my total capacity on a weekly ba ... - SAP - PS releated issues and solutions I need
Hi , Friends : Last one year , i am working in SAP - MM but now recently i have done SAP - PS certifaction training and now i am SAP - PS certified consultant but i have no idea about what kind ... - Planning board Vs MS Projects
Hi, Required % of activity confirmation on GANTT chart in front of WBS element. Required percentage of Activity confirmation in planning board. Required Balance of work and duration. ... - Message on CJ9BS
Hello, Could you help me? What is the meaning of the message KOPV006 in CJ9BS transaction? No valid plan profile could be determined for order ..., No valid planning profile has been entered in or ... - Material Purchase order is not allowed in WBS
Hi , If any one have a solution please send me . During service entry creation when user put the wbs element no in account assignment of service in line item , message comes M ... - UNIT OR ASYNCHRONOUS COSTING IN PROJECTS
HI ALL, I HAVE ATTACHED SOME FINISHED PRODUCTS IN PROJECTS- WBS ,FOR WWHICH I HAVE WBS-WISE SPECIFIC BOMS AND ROUTINGS,AND WHEN I RUN MRP PLANNED ORDERS ARE CREATED FROM WHICH SIMULTANEOUSLY PRODUC ... - Links to documents stored on the Web
Is there a way to create a document (under a project) which refers to a URL and not to a document stored on a content server? Yes you can, but you need define in DMS customizing some points. 1 ... - SAP Real Estate
Hi Guys Can somebody give me insight into integrations aspects of SAP PS with Real estate object. Thanks in advance. Hi, Integration of PS and RE Flex module is new and weak. 1. Yo ... - PS - PO Excise Value Not Deducted from Available Budget
Hello SAP Gurus, I have a problem that when an excisable PO is created against SAP Project defined in Project Systems, then the Excise value in PO is not deducted from Project Budget. Only the Basic ... - FAQ 1: Projektsystem FAQ Level 1
Basic Areas: 1. Master Data / Master Data Transactions a) General Archiving PS_PROJECT -> see FAQ 2-note 573077 Authorizat ... - Person not qualified although no requirement profile II
Symptom You created a requirement profile with certain qualifications in an order operation. You then carry out requirements planning for the order operation. When you select by using the results ...
Posted in: PS (Project Systems) » | By: rekha | Date: 26 Apr 2012 6:36 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 01 Mar 2012 10:59 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 29 Feb 2012 5:32 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 05 Jan 2012 10:05 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 21 Dec 2011 5:22 am | Comments (0)
Posted in: PS (Project Systems) » | By: Amit | Date: 29 Aug 2011 8:03 am | Comments (1)
Posted in: PS (Project Systems) » Work Breakdown Structure | By: saketpratap | Date: 15 Dec 2010 11:33 am | Comments (12)
Posted in: PS (Project Systems) » | By: rekha | Date: 17 Sep 2010 3:25 am | Comments (1)
Posted in: PS (Project Systems) » | By: | Date: 23 Jun 2010 11:24 am | Comments (1)
Posted in: PS (Project Systems) » | By: saketpratap | Date: 12 Mar 2010 4:16 pm | Comments (1)
Posted in: PS (Project Systems) » | By: Amit Srivastava | Date: 23 Jul 2009 12:03 pm | Comments (4)
Posted in: PS (Project Systems) » | By: babu | Date: 25 May 2009 10:16 am | Comments (2)
Posted in: PS (Project Systems) » | By: | Date: 20 May 2009 8:09 pm | Comments (1)
Posted in: PS (Project Systems) » | By: Amit Srivastava | Date: 30 Apr 2009 2:14 pm | Comments (4)
Posted in: PS (Project Systems) » | By: | Date: 28 Apr 2009 1:56 pm | Comments (0)
Posted in: PS (Project Systems) » | By: Amit | Date: 08 Dec 2008 4:04 pm | Comments (1)
Posted in: PS (Project Systems) » | By: rekha | Date: 30 Oct 2008 2:44 pm | Comments (3)
Posted in: PS (Project Systems) » | By: Bindal Dave | Date: 17 Sep 2008 9:10 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 29 Mar 2008 8:32 am | Comments (0)
Posted in: PS (Project Systems) » | By: rekha | Date: 21 Jan 2008 9:34 am | Comments (0)
Tutorials | Forum | Books | Interview Questions | Transaction Codes | Institutes | Jobs | Classifieds | News | Announcements
SAP ERP Support/Consulting | RSS/Syndication | Contact Us | Terms Of Use | Terms & Conditions
SAP ERP Support/Consulting | RSS/Syndication | Contact Us | Terms Of Use | Terms & Conditions
©2005-2011 SAP Techies. All rights reserved.